View from the Perch
Building rock retaining walls
Septic system preparation
Blasting
Site prep after blasting
Trenching for power, water, cable
Forming for footings
Forming for foundation
Concrete pumper arrives at dusk
Damp proofing and drainage
Pre-fabbing the walls
Pre-fabbing SIP roofing
Backfill and slab prep
Pumping the slab
Framing the basement
Walking the joists
The floor goes on
Walls arrive - thanks Bob!
Which window is this?
Beams in place, now the roof - one crane, six guys, one day!
Membrane for rain protection
Windows are in - now the decking
View from Living Room over Oyster Bay
Structural and framing passed - now for fascia!
Plumbing and electrical done - fireplace underway
Roof finished, now flashing and siding!
Soffit and Cedar Shingle siding.
Salvaged rusted metal siding waiting for it's turn!
Cedar front door.
Drywallers hard at work!!
Lower flashing for rusted siding.
Taping and finish coats.
Angles, angles, angles!!!
Early morning shadows.
First piece of salvaged rusting siding!
Final electrical and light fixtures.
Oriented strand bamboo flooring.